|
2005 This is year two for Ames High School at the Tororo Parents Secondary Girls School
Lumber purchased in Tororo being carried to the rafter assembly area.
Here we see the roof assembly in place. What looks like burnt wood is actually a pitch applied to protect the timbers from the African termites. The wall construction in this region is always made of brick, this is due to the ever present African termites. Those little bugs could eat the entire school in one year!
|
|||||||||||||
![]() |
| about
us |
|
![]() |
Life
to Life Global Building Group, Inc. Copyright 2006. All rights reserved. |